28 Build King - SCT Joint Venture 2642583 Ը ް üߴٰ ߴ. The Execution of the Low Headroom Deep Cement Mixing("DCM") Works, including the DCM Site Trial of Tung Chung New Town Extension - Reclamation and Advanced Works ް̴.
Ⱓ 2020 1 24Ϻ 2020 12 31ϱ ޱⰣ 342̴. ̹ ü ް ݾ ֱ 36073422 7.3% Ը.
̹ ô ù ô. ް ݾ .
3б 8989784 7682976 17% þ. Ⱓ 482550 653148 26.1% پ. 441157 518906 14.9% ߴ.
̳ 10 35 ְ ϴ 3.90% ϶ 17250̴. 簡 ְ(PER) 11.6, ְڻ(PBR) 1.04, ڱںͷ(ROE) 9.0%.
üӺ ٷΰ(https://goo.gl/V29Fsk)
( 0)